WEEK 12: GENERATE COSTING

OBJECTIVE
  1. To survey cost of equipment need to build prototype of quadruped robot from website and electrical store.
  2. To calculate the maximum budget for all the equipment.
METHODOLOGY
  1. Survey the equipment's standard price need to build the prototype from website store.
  2. Survey from near electrical store for the equipment price.
  3. Make a decision on choosing the right offer price and its quality. 
  4. Tabulate the choice equipment with it's price and the total budget.
RESULT

After following the method, the equipment have been decide thoroughly. The estimate budget for building the prototype is list in the table below.

Budget Costing

ANALYSIS/DISCUSSION

From the result obtained, the total cost for all the equipment is RM414.00 . This total budget is the estimate total costing for the equipment. The total cost can be change if there is any update on the equipment price from time to time or if there is any additional equipment need. However, this total cost is the maximum budget for now.

CONCLUSION

In conclusion, this week objective is achieved. The total price for all equipment need to build this prototype is listed in the table above. The total cost for everything is calculated including the cost to print the 3D printed body part.